Deaeration is the mechanical removal of dissolved gasses such as oxygen and carbon dioxide from a fluid.
Feedwater to the boller should contain less than 0.005 cc of 02 per liter (7 ppb) which is the usual guarantee of Deaerator suppliers.
Termochimica's Spray & Tray Deaerators Incorporate a strong basis design that assure the above mentioned performance over varying loads of incoming water.
The process of Termochimica Deaerators involves two main stages in which the steam and water move in opposite directions...

Learn more

September 2019 Formosa placed a order to Termochimica for the design of two Deaerators, each having a capacity of 217 T/h as BFW. Performance is based on O2 reduction under 7 ppb and CO2 zero. Termochimica’s scope includes process , key internals and performance guarantee . The Project, named RSFFB and located in the Philippines, marks the long cooperation with one of the most appreciated contractors in the world.
May 2019 A new order was placed by Formosa to Termochimica for the design of one Deaerator according to HEI Std and having capacity of 60 T/h as BFW. Performance is based on O2 reduction under 7 ppb and CO2 zero. Termochimica’s scope includes process, key internals and performance guarantee . This Project is named Ning Bo Project located in China. This order signs a large continuity of supply from Termochimica to Far East and confirms long partnership with Formosa Group.
February 2019 Another order was placed by Formosa to Termochimica for the design of one Deaerator according to HEI Std and having capacity of 140 T/h as BFW. Performance is based on O2 reduction under 7 ppb and CO2 zero. Termochimica’s scope includes process, key internals and performance guarantee . The Project is named Pia Project located in China.
January 2019 A new order was placed by GTB to Termochimica for the design of one Deaerator according to HEI Std and having capacity of 65 T/h as BFW. Performance is based on O2 reduction under 7 ppb and CO2 zero. Termochimica’s scope includes process, key internals and performance guarantee . The Project is named PTTPE Project located in Thailand. This order signs large continuity of supply from Termochimica to Far East and confirms long partnership with GTB Group.
June 2018 Mapna placed an order to Termochimica for the design of three integrated type Deaerators, each having a capacity of 405 T/h as BFW. Performance is based on O2 reduction under 7 ppb and CO2 zero. Termochimica’s scope includes process and mechanical design , key internals and performance guarantee . The Project, named Rudshur and located in Iran, marks the beginning of cooperation with one of the most appreciated industrial boiler manufacturers in the world.
April 2018 A new order was placed by Tech- International to Termochimica for the design of one Deaerator designed according to HEI Std and having capacity of 830 T/h as BFW. Performance is based on O2 reduction under 7 ppb and CO2 zero. Termochimica’s scope includes process design , key internals and performance guarantee . The Project is named Sabiya 3 Project located in Kuwait. This order signs large continuity of supply from Termochimica to Middle East and confirms long partnership with Tech International.
March 2018 A precious order was placed by FAB-TECH to Termochimica for the design of one Deaerator having capacity of 26.6 T/h as BFW. Performance is based on O2 reduction under 7 ppb and CO2 zero. Termochimica’s scope includes process design , key internals and performance guarantee . The Project is named SI Group PP Project located in India. The complete Deaerator is manufactured by FAB-TECH Works & Constructions PVT.LTD. , Mumbai.
April 2017 A new order was placed by Formosa Corp. to Termochimica for the design of four Deaerators designed according to HEI Std and having capacity of 473T/h each , as BFW. Performance is based on O2 reduction under 7 ppb and CO2 zero. Termochimica’s scope includes process design , key internals and performance guarantee . The Project is named MPGC located in Philippines.
February 2017 Termochimica was awarded by GSD for the precious supply of one Deaerator according to HEI Std , having capacity = 417 T/h as BFW , able to reduce O2 content under 7 ppb and CO2 zero. Termochimica’s scope includes process design , key internals and performance guarantee . The Project is named ENKA Turbine Replacement Project located in Turkey . This order signs large continuity of supply from Termochimica to Western Asia and confirms long partnership with GSD Company.
December 2016 Termochimica was awarded by Natek for the precious supply of one Deaerator according to HEI Std, having capacity = 156 T/h as BFW able to reduce O2 content under 7 ppb and CO2 zero. Termochimica’s scope includes process design , key internals and performance guarantee . The Project name is Gazprom Combined Oil Refining Unit located in Russian Federation.
December 2016 A new order was placed by Formosa Corp. to Termochimica for the design of one Deaerator designed according to HEI Std and having capacity of 586T/h as BFW. Performance is based on O2 reduction under 7 ppb and CO2 zero. Termochimica’s scope includes process design , key internals and performance guarantee . The Project is named Ning-Bo located in Republic of China.
December 2016 Termochimica was awarded by Air Com for the precious supply of one Deaerator according to CE-PED, having capacity = 92 T/h as BFW able to reduce O2 content under 7 ppb and CO2 zero. Termochimica’s scope includes process design , key internals and performance guarantee . The Project name is G2-Green Refining Project located in Gela- Italy.
December 2016 Termochimica received again an important order from Formosa Corporation regarding the supply of process and key internals for one Deaerator with capacity of 590 T/h, designed to reduce O2 to 7 ppb or less and negligible CO2 . The Project is located in Formosa Plastics ,Texas-USA . This order signs large continuity of supply from Termochimica to Formosa Group and proves reliability of our know-how which is recognized by the most important worldwide oil&gas and energy Customers .
June 2016 Termochimica was awarded by Tech International for the precious supply of one Deaerator according to HEI Std , having capacity = 430 T/h as BFW , able to reduce O2 content under 7 ppb and CO2 zero. Termochimica’s scope includes process design , key internals and performance guarantee . The Project is named KNPC Gas Train GT-5 located in Kuwait . This order signs large continuity of supply from Termochimica to Middle East and confirms long partnership with Tech International as one of the most reliable fabricators of Deaerators in this region.

See our resources